Supply of 5 Absorbing Towers.
Project: Gas Treatment plant |
Developer company: ATB Riva Calzoni |
Place: Kazachya (Russia) |
Category: Oil and Gas Project |
Customer: SIIRTEC NIGI |
End User: GAZPROM |
Year: 2012 |
Status: |
Supply of five (5) Absorbing Towers in low alloy steel with a total fabricated weight of 1,100 tons and thickness of up to 93 mm.
This supply is part of a major expansion of GAZPROM refinery located in Kazachya in order to increase production from 200 MW to 330 MW.
Details:
- Shell Material SA533TpBC2
- Weight 219 Tons
- Internal Diameter 4,600 mm
- Thickness 93 mm
- Tangentline Lenght 10,000 m