Galleria Video
Sfoglia le nostra galleria video
Video
Sfoglia la nostra galleria di video del gruppo ATB.

07 November 2018
Passion for Manufacturing since 1903
A journey into the world of ATB Riva Calzoni, from welding to the final product, among the materials, processes, production steps, and especially among the skills of the people who work with us every day.
Vedi Video

24 April 2020
ATB Group Renewables Division - Goglio hydroelectric project
A journey to discover the technologies offered by ATB Group for the renewable energy sector. The Renewables division has manufactured the hydroelectric turbines of the Goglio power plant, in Piedmont, in the province of Verbano Cusio-Ossola. A project commissioned by Enel Green Power and successfully completed.
Vedi Video

06 April 2020
Artogne, the ATB Group's hub for renewable energy
Artogne Workshop is a new site dedicated to renewable energy. It was designed and equipped to meet the planning and production needs of two sectors: Wind Power and Small Hydro. ATB Group can manufacture the finished product, responsible for both mechanical and electrical aspects, starting from scratch, assembling it and making it ready for installation. https://www.atb.group/en/rnw/
Vedi Video

11 July 2019
ATB Riva Calzoni for Alto Maipo hydroelectric project
Since 2017 ATB Riva Calzoni has been established in Alto Maipo, Chile, to work on the construction of penstocks for the three vertical shafts of the Aes Gener hydroelectric plant.
Vedi Video

17 January 2019
Pama Speedram for mechanical department of ATB Riva Calzoni
It is ATB Riva Calzoni's comeback to the nuclear market. More specifically to making casks, that is, the steel containers used to transport spent fuel from nuclear power plants. Such comeback required further developing the productive capacities of the mechanical department of the Roncadelle facilities.
Vedi Video

11 July 2019
Abbattimento torre piezometrica Acciaierie di Verona
Sid Srl, parte di Semat Spa, porta a termine con successo la demolizione con esplosivo all’interno del sito siderurgico del Gruppo Pittini. Sono bastati pochi secondi per veder scomparire una delle torri piezometriche dell’acciaieria di Verona. Una struttura di calcestruzzo alta circa 30 metri che nei piani di ristrutturazione degli impianti predisposti dalla proprietà del sito siderurgico, il Gruppo Pittini, doveva essere eliminata, insieme alla gemella alla quale a breve toccherà la stessa sorte. L’intervento, coordinato dalla Prefettura, è stato realizzato da Sid Srl – Società Italiana Demolizioni, parte di Semat Spa.
Vedi Video

07 November 2018
The innovation is in the air: ATB Riva Calzoni crede nell’energia eolica
The innovation is in the air! ATB Riva Calzoni believes in wind power and returns to the wind market after being in the late 80’s and early 90’s a pioneer in Italy with the M30 single blade wind turbine, which as been installed on several sites.
Vedi Video

06 September 2019
ATB at Key Energy 2017
ATB Riva Calzoni participated in Key Energy: where energy meets the future. From 7th to 10th of November 2017 ATB Riva Calzoni’s wind division was present at the Rimini Expo Centre, leading fair for renewable energies in the Mediterranean area.
Vedi Video

17 July 2017
MMHE-ATB - Rapid Project Bullet Tanks F load out
Rapid Project Bullet Tanks F load out, the biggest equipment ever fabricated by MMHE-ATB. MMHE-ATB Sdn. Bhd. is a joint venture between ATB Riva Calzoni (ATB RC) and Malaysia Marine & Heavy Engineering Sdn. Bhd. (MMHE), was set up in Malaysia in the year 2000, located inside of MMHE yard at Pasir Gudang, Johor and adjacent to Singapore Island.
Vedi Video

19 May 2017
The miter gates for Isola Serafini
The miter gates for Isola Serafini. The two gates, transported by road to Isola Serafini, were placed in the new navigation lock that will enter in operation from this summer. ATB Riva Calzoni selected for the installation all the hydromechanical works of the Project that will increase the commercial traffic of Po river.
Vedi Video

22 October 2016
ATB 500.54 Wind Turbine Installation in United Kingdom
The ATB 500.54 and ATB 750.54 are well-proven German wind turbine designs with excellent performance records resulting from several years of successful field operation. The turbine incorporates state-of-the-art technologies at the forefront of modern wind power generation systems.
Vedi Video

22 May 2017
Hydro Energia for Tirreno Power
Hydro Energia owned by ATB Riva Calzoni is a contractor with more than 25 years of experience in providing EPC Services for the supply of Small Hydroelectric Power Plant.
Vedi Video

24 October 2016
Hydro Energia - Systems and services for small Hydroelectric Power Plants
Hydro Energia, is an Italian company established in 2011, with the acquisition of the whole know-how, references and human resources from the Hydropower BU of CO-VER Energia, a general contractor with more than twenty-five years of experience in providing EPC Services for the supply of Small Hydroelectric Power Plant, with a proprietary technology for the design and manufacturing of hydroelectric turbines. Hydro Energia is controlled by ATB Riva Calzoni, and started with the heritage of a complete organization with more than 40 employees, with highly skilled and experienced technicians in HPP applications. Even though the company historically operated in the Italian market, the new company, young and dynamic, has already started a process of internationalization that brought important contracts in the major markets abroad.
Vedi Video

21 October 2016
Wind Power - ATB Riva Calzoni Wind Turbine ATB 500.54
The ATB 500.54 and ATB 750.54 are a well proven German wind turbine design with excellent performances documented through several years of field operation. The turbine incorporates state of the art technologies at the forefront of current wind power generation systems. A variable pitch controlled wind turbine with a 54m rotor. The first prototype was installed in 1997, since then over 20MW have been installed and are successfully operating in Germany, Austria and Canada. The turbine is available in 50m or 73m hub heights, its towers are manufactured using the highest quality steel with a durable C5 protective outer coating to ensure a minimum lifespan of 20 years even in the most severe operating conditions.
Vedi Video

02 October 2016
Oil & Gas - ATB Riva Calzoni Porto Marghera (VE)
On April 24th, 2016, loading operation of 1nr 500-ton Hydrotreater reactor in Marghera port of Venice, Italy was completed for the PetroPeru project of Talara, Peru under execution by Messrs Tecnicas Reunidas of Spain. The loading operation was accomplished efficiently within 6 hours.
Vedi Video

13 December 2016
ATB Wind Power Tecnology
The ATB Wind Power Tecnology. The turbine incorporates state-of-the-art technologies at the forefront of modern wind power generation.
Vedi Video

24 February 2015
Albero della Vita: nell'antro dell'acciaio
Continuano le riprese del docu-film dedicato all'Albero della Vita, l'opera simbolo di Expo 2015, realizzata dalle aziende del Consorzio Orgoglio Brescia. Qui, il cuore in acciaio dell'Albero della Vita - 2,50 m di diametro e 40 mm di spessore - è mostrato nel suo "antro" materno: la sede dell'ATB Riva Calzoni di Roncadelle (BS). L'altra azienda che ha lavorato a questa parte in acciaio dell'Albero della Vita è la Ormis di Castegnato (BS). Le riprese sono della AlbatrosFilm, che sta realizzando il docu-film. Segui le news su www.alberodellavita.bs.it e su www.expo.bs.it
Vedi Video

24 February 2015
Albero della Vita: il volo del drone
L’Albero della Vita come non lo avete mai visto: un drone riprende il cantiere dove sta nascendo l’opera simbolo di Expo 2015. Il suo volo leggero svela il basamento della struttura, posta al centro del Lake Arena, e la passerella che permetterà di raggiungere l’opera. Le immagini sono state realizzate dalla società bresciana AlbatrosFilm, che realizzerà un documentario dedicato proprio alla costruzione dell’icona di Expo 2015.
Vedi Video