Wind turbines of Lercara Friddi and Cancellara are ready to run
In September two more equipements will be installed in Trapani and Marsala (Sicily).
In September two more equipements will be installed in Trapani and Marsala (Sicily).
An interview with the vicepresident of ATB Riva Calzoni published in Il Pianeta Terra Magazine
The wind turbine, manufactured in the new site of Artogne, has shipped to the plant in Lercara Friddi, in the province of Palermo.
In the beginning of March ATB Riva Calzoni opened a new plant in Artogne. It was projected and equiped to meet the planning and productive needs of two divisions: Wind and Small Hydro.
The Green Technology Expo Rimini 8/11 November 2016.
A prototype of a new wind turbine is under development and first units will be installed in Italy within end of 2016.
Un modo più ecologico di concepire la produzione energetica permette ad aziende, quali ATB Riva Calzoni, di diversificare la propria offerta puntando sulle energie rinnovabili...
The Global On-& Offshore Expo 27–30 September 2016 Hamburg
No more content
No more pages to load