Nizhnekamsk refinery upgrade project

Supply of 2 Separators.

English Italian Spanish
Project: Nizhnekamsk refinery upgrade project
Company: ATB Riva Calzoni
Location: Nizhnekamsk (Russia)
Category: Oil and Gas Project
Customer: VCC TAIF
End User: VCC TAIF
Period: 2012

Supply of two (2) Separators in low alloy steel with vanadium modified alloy material with a total fabricated weight of 1,200 tons and thickness of up to 265 mm.
This supply is part of a major expansion of the Nizhnekamsk Refinery Upgrade Project located in Russia in order to produce 7.0 million tons/year of crude oil.

Details:

  • Shell Material SA 336 F22 V + weld overlay Tp347
  • Weight 1,080 Tons
  • Internal Diameter 5,208 mm
  • Thickness 265 mm
  • Tangentline Lenght 17,600 m