FPSO Kaombo Project

Supply of 8 Separators, 18 Process Drums and 16 Utility Drums


Project: FPSO Kaombo Project
Developer company: MMHE-ATB
Place: Angola
Category: Oil and Gas Project
Customer: SAIPEM SA
End User: TOTAL E&P
Year: 2016
Status:

Supply of eight (8) Separators, eighteen (18) Process Drums and sixteen (16) Utility Drums in carbon steel and stainless steel material with a total fabricated weight of 1,644 tons and thickness of up to 82 mm.