San Valentino hydroelectric project: completed the Installations activities of the wheel gates

Completed the doubling of wheel gate valves for the second outlet of the San Valentino Dam in Bolzano, with integrated anti-ice system.



San Valentino Hydroelectric Project completed

We are proud to announce the completion of a strategic work for the safety of Lake Resia: the doubling of the gates for the second overflow outlet of the San Valentino Dam in Bolzano.

In this hydroelectric project, in collaboration with Alperia, ATB Riva Calzoni delivered two turnkey radial gates designed to ensure maximum reliability and ease of maintenance.

Civil works were carried out by SEMAT - Civil Construction & Industrial Services, part of ATB Group – which handled the foundations, technical spaces, and all structural connections to the dam body.

To guarantee smooth operation even in the harshest winter conditions, we integrated an advanced anti-icing system: resistive heaters and intelligent heating elements keep control mechanisms ice-free, protecting both equipment and structure.

A special thanks goes out to all field teams and our partners, whose dedication and professionalism made this achievement possible.
With this intervention, Lake Resia is now better equipped to face extreme weather events and ensure controlled water discharge in every season. ATB Riva Calzoni – Engineering, quality, and innovation at the service of communities.

Recent posts

Popular posts