SEMAT

Articles filtered for the category SEMAT

ArcelorMittal selects ATB Group for the secondary yard coverings ArcelorMittal selects ATB Group for the secondary yard coverings
14 May 2020 | 1026

Taranto plant: The secondary yard coverings

The Civil Construction & Industrial Services Division has been awarded the project. Activities at the Sinter South yard already underway.

Read news
Renewal of Environment, Safety and Quality Certifications Renewal of Environment, Safety and Quality Certifications
08 April 2020 | 631

Civil Construction & Industrial Services Certifications

The audits with the certifying body have returned a positive result, which confirms the validity of the practices adopted by Semat, part of ATB Group, as a guideline for its corporate policies.

Read news
In Europe, at the service of the steel industry with efficiency and excellent performance In Europe, at the service of the steel industry with efficiency and excellent performance
20 December 2019 | 223

In Europe, at the service of the steel industry

The Civil Construction and Industrial Services Division has successfully completed a new series of works in Italy, France and Germany.

Read news
Quarry&Construction Magazine: The mirror of reliability Quarry&Construction Magazine: The mirror of reliability
11 November 2019 | 196

Press Review: Quarry&Construction Magazine

An interview with Giandomenico Cuscela, gm Site Taranto for ATB Group, on the construction of the foundations for the mineral parks covering of the ArcelorMittal steelworks. This is possible thanks to the CAT cranes that are part of the ATB fleet.

Read news
Semat Europa: a promising 2019 Semat Europa: a promising 2019
28 January 2019 | 119

A promising 2019

Works continue in many production sites in France, Belgium, Germany and Italy. New acquisitions in the pipeline for next year

Read news
Ilva: new challenge for the future with ArcelorMittal Ilva: new challenge for the future with ArcelorMittal
28 January 2019 | 112

New challenge for the future

Safety and Environment: the priority of the industrial plan presented to the supply chain in mid-November. Trombini: 'Semat is ready'

Read news

No more content

No more pages to load

Next page