RAPID - Package 1 Project

Supply of 20 Utility Drums

English Italian Spanish
Project: RAPID - Package 1 Project
Company: MMHE-ATB
Location: Malaysia
Category: Oil and Gas Project
Customer: CTCI Chiyoda Malaysia RAPID JV
End User: PETRONAS PRPC
Period: 2016

Supply of twenty (20) Utility Drums in carbon steel material with a total fabricated weight of 440 tons and thickness of up to 60 mm.

The Refinery and Petrochemical Integrated Development (RAPID) project is part of PETRONAS' Pengerang Integrated Complex (PIC), designed to have a 300,000 barrels per day oil refinery as well as a petrochemical complex with an annual capacity of 7.7 million tonnes a year.