Workshop for penstock fabrication at Ituango Hydropower Project
ATB Riva Calzoni completed the temporary workshop at Ituango Hydropower Project, 2.480 MW, in Colombia.
ATB Riva Calzoni completed the temporary workshop at Ituango Hydropower Project, 2.480 MW, in Colombia.
First edition of Welding, Boilermaker and Department Operator Courses with highly specialized training course aimed at entering the company.
ATB Riva Calzoni has manufactured and shipped the first of a series of "Transportation Casks", on behalf of an important French customer.
ATB has been chosen by the consortium between Samsung, Petrofac and Saipem to supply equipment that will be part of the Clean Fuel unit of the Thai plant.
2019 was a highly positive year of the Renewables Division. Three projects worth highlighting.
InBerg and InBre: new projects in Lombardy. Semat and Sid together for Sider Potenza and Franzoni
Signed the agreement for the supply of two pressure vessels for the Dos Bocas refinery, the largest in Mexico.
New customers. Projects underway. The bottom outlet is being installed in Laos. Gates are shipped to Uganda.
The Civil Construction & Industrial Services Division has been awarded the project. Activities at the Sinter South yard already underway.
Two reactors that form part of this first shipment are about to break the record held by Dangote: a pair of LC Fining reactors, 1500-ton and over fifty-metre long each.
No more content
No more pages to load